Has anyone restored a V20 backup to a separate Hosted by 3CX test instance?

voipfreak

Customer
Joined
Oct 11, 2025
Messages
2
Reaction score
1
Hi everyone,

Has anyone successfully copied an existing on-premises V20 configuration into a separate Hosted by 3CX instance using a temporary license and different FQDN, while leaving the production system running?

I’m planning a customer migration and want to test their actual configuration before cutting over. I’d prefer to restore the existing extensions, IVRs, queues, ring groups, prompts, and routing rather than rebuild everything manually.

The test setup would have:

  • Its own temporary/trial license and new 3CX FQDN.
  • A separate VoIP.ms sub-account with spare test DIDs.
  • Separate test phones connected through a 3CX SBC.
The production PBX would retain its existing license, FQDN, trunk registrations, and live numbers throughout testing. I intend to change the FQDN when we migrate, so keeping the old hostname isn’t a requirement.

I’m specifically looking for firsthand experience with:

  1. Preparing the backup: How did you prevent the production license and FQDN from being carried into the test instance? Did 3CX assist, or did you use another method?
  2. Restoring into hosted: Did you create the hosted instance first and then restore through remote backup storage, or restore during deployment?
  3. Isolating production services: How did you prevent restored trunks and integrations from connecting with production credentials before you could change them?
  4. Temporary licensing: What license did you use for testing?
  5. Final cutover: Were you able to apply the customer’s existing paid license afterward while retaining the new FQDN and tested configuration, or did that require another deployment?
I found this related discussion about changing the FQDN when moving to Hosted by 3CX:
https://www.3cx.com/community/threa...om-on-prem-hosted-vm-with-custom-fqdn.137394/

However, I haven’t found a confirmed procedure for running a separate hosted test copy alongside production.

I’d expect testing before a production migration to be a fairly common requirement. If there’s a technical guide covering the process and requirements, I’d appreciate a link.

Please mention the V20 update/build you tested and whether it was specifically Hosted by 3CX, since self-hosted cloud results may differ. Supported procedures would be ideal, but clearly identified firsthand experience with workarounds would also help clarify what’s possible.

TIA!
 
There is no supported path for what you are planning to do. I also don’t really see a necessity for it. Aside from reconfiguring the local phones to use an SBC, there shouldn’t be much else involved in the migration.
 
  • Like
Reactions: Evolute IT
Sure, neither of us feel it necessary but my client does which is why I ask, Appreciate your reply but I've already figured it out and got it working, Thanks
Peace!
 
  • Like
Reactions: bitn2

Forum statistics

Threads
112,503
Messages
592,887
Members
165,721
Latest member
LeeonLau