- Joined
- Mar 29, 2023
- Messages
- 2
- Reaction score
- 0
we have a test environment we are on v18 9 and want ot go. to v20 for teting before it is rolled out. I dont have an option to upgrade but I'd love to be able to rebuild the hosted instance but do not have an option to do that. also when I shut down the instance in the portal, the "restore" option is greyed out. I'd love to rebuild it in v20 and restore our backup.