- Joined
- Aug 13, 2025
- Messages
- 3
- Reaction score
- 0
Hello!
We're planning to move potential customer's 3CX system to another server in another country. Custom FQDN and ENT license should remain the same. The idea is to take backup of existing server, deploy this backup on a new server in another country, but the original server should continue working as a production system, since we need to make additional configuration and test everything on a new server. Almost in every forum thread about server's migration it's said that you have to switch off original server before deploying new server, but this doesn't suit us because we need some time (probably several days) to prepare new server and customer cannot have interruption in 3CX system working.
So, the question is it really required to switch off original server and can we have 2 servers running simultaneously with the same FQDN and license before final switch to a new server?
We're planning to move potential customer's 3CX system to another server in another country. Custom FQDN and ENT license should remain the same. The idea is to take backup of existing server, deploy this backup on a new server in another country, but the original server should continue working as a production system, since we need to make additional configuration and test everything on a new server. Almost in every forum thread about server's migration it's said that you have to switch off original server before deploying new server, but this doesn't suit us because we need some time (probably several days) to prepare new server and customer cannot have interruption in 3CX system working.
So, the question is it really required to switch off original server and can we have 2 servers running simultaneously with the same FQDN and license before final switch to a new server?