- Joined
- Dec 3, 2020
- Messages
- 20
- Reaction score
- 3
Hello all.
Just done an upgrade from V16 to V18 - very nice.
Got a bit of an odd one with the 2 scheduled reports i had geared up at 18:00 - since the upgrade i get the same reports run again 90 mins later but with empty content.
Edit the report and change the time and sure enough 3 of the same 2 of which are empty.
It seems every edit or change only adds to the jobs
Are these stored somewhere like windows scheduled tasks that i can purge and bin these rogue phantom reports ?
Cheers
Just done an upgrade from V16 to V18 - very nice.
Got a bit of an odd one with the 2 scheduled reports i had geared up at 18:00 - since the upgrade i get the same reports run again 90 mins later but with empty content.
Edit the report and change the time and sure enough 3 of the same 2 of which are empty.
It seems every edit or change only adds to the jobs
Are these stored somewhere like windows scheduled tasks that i can purge and bin these rogue phantom reports ?
Cheers