- Joined
- Apr 28, 2021
- Messages
- 35
- Reaction score
- 5
Hello,
We are on a 6 site interconnection project.
So there are 6 3CXs that we want to connect to each other.
What are the best practices for the interconnections of bridges between sites?
-> 1st solution:
Bridges:
Site 1 master - Site 2 Slave
Site 2 master - Site 3 Slave
Site 3 master - Site 4 Slave
Site 4 master - Site 5 Slave
Site 5 master - Site 6 Slave
Site 6 master - Site 1 Slave
-> 2nd solution:
Bridges:
Each site is connected to all the others and master or slave does not matter as long as they are in communication.
Thank you in advance for your help.
We are on a 6 site interconnection project.
So there are 6 3CXs that we want to connect to each other.
What are the best practices for the interconnections of bridges between sites?
-> 1st solution:
Bridges:
Site 1 master - Site 2 Slave
Site 2 master - Site 3 Slave
Site 3 master - Site 4 Slave
Site 4 master - Site 5 Slave
Site 5 master - Site 6 Slave
Site 6 master - Site 1 Slave
-> 2nd solution:
Bridges:
Each site is connected to all the others and master or slave does not matter as long as they are in communication.
Thank you in advance for your help.
