- Joined
- May 4, 2020
- Messages
- 23
- Reaction score
- 1
I reviewed the 3CX migration article:
https://www.3cx.com/docs/switch-hosted-pbx/
and I just want to check/verify that after step 1, downloading a full backup from the original Google Compute hosted install, I would need to be shut that down before proceeding to step 2, initiating the migration to 3CX hosted in the 3CX portal? Both the original and new instances cannot be running at the same time correct?
https://www.3cx.com/docs/switch-hosted-pbx/
and I just want to check/verify that after step 1, downloading a full backup from the original Google Compute hosted install, I would need to be shut that down before proceeding to step 2, initiating the migration to 3CX hosted in the 3CX portal? Both the original and new instances cannot be running at the same time correct?